Mon - Sun 6:00am - 6:00pmtech@towersealants.com866-897-7568
Installation Guide

AU-1 Expansion Joint
Installation Guide

Comprehensive installation instructions for AU-1 Commercial Construction Sealant in expansion joint applications.

Video Tutorial

Watch the Installation Process

Follow along with our step-by-step video guide for professional AU-1 expansion joint installation.

Installing expansion joints in concrete with sealant is an important part of construction work. It ensures that buildings remain weather-tight and resistant to water damage. However, using the wrong type of sealant, or not applying it correctly, can lead to costly and time-consuming problems down the line.

One of our fastest-growing products right now for exterior applications is AU-1, a one-part, low-odor, gun-grade, elastomeric construction sealant. In this guide, we'll provide an in-depth look at AU-1, including its properties, recommended applications, testing, surface preparation and installation procedures, as well as tips for ensuring optimal results.

Product Specifications

Properties of AU-1 Sealant

Follow along with our step-by-step video guide for professional AU-1 expansion joint installation.

  • ASTM C-920 Certified

    Type S, Grade NS, Class 35 sealant

    AU-1 is made from an aqueous-based urethane acrylic polymer and is one of the first high-performance sealants of its kind for the commercial building industry.

    Key Benefits
    • No mixing or priming required
    • Paintable with no shine-through
    • VOC-compliant nationwide
    Performance Features
    • Extremely UV resistant
    • High elasticity in all climates
    • No job-site solvents needed
  • AU-1 Commercial Construction Sealant product family pail cartridges and squeeze tubes
  • Testing Requirements

    Prior to any project, TOWER Sealants recommends testing or project mockup to be performed at the job site, under the same conditions as the planned project. TOWER will provide compatibility and adhesion testing upon request, as well as field testing assistance and guidelines. Please contact TOWER for guidance on peel adhesion testing protocol for waterproofing projects.

  • Critical Step

    Surface Preparation

    Proper surface preparation is crucial for achieving a strong and long-lasting sealant bond.

    Temperature Requirements
    • Above 40°F and rising
    • Not exceeding 140°F
    • No frozen substrates
    Application Restrictions
    • Not for below-grade use
    • Avoid ponding areas
    • No high foot traffic
    Application Restrictions
    No primer required for most applications including concrete and metals. Contact TOWER for difficult substrates.

    Design Standards

    Sealant Joint Design

    Following ASTM C1193 Standard Guide ensures optimal joint performance.

  • Proper joint design diagram with sealant depth ratio chart for various joint widths
    • Design Requirements

    Width: Not to exceed 2″

    Ratio: A to B should be 2:1

    Backer Rod: When depth > ½”

    • Prevent 3-Point Adhesion
    Use bond breaker tape for shallow joints where backer rod installation isn't feasible.
  • Fillet caulk joint diagram showing sealant bead with bond breaker tape and backer rod
  • Installation Process

    Application Steps

  • Install Backing Material

    Use an open or closed-cell, circular backer rod that fits the joint walls. For shallow joints, apply bond breaker tape. If backer rod is painted, rotate it to reduce 3-point adhesion potential.

  • Apply AU-1 Sealant

    AU-1 requires no mixing—ready to use as soon as the container is opened. Fill the entire joint with sealant, leaving no air pockets. Ensure contact with both substrates throughout the joint.

    Caulking gun applying sealant in an expansion joint on stucco wall
  • Tool Within 15 Minutes

    Use a flat tool to create a flush, flat finish. This allows AU-1's evaporative cure to form an ideal hourglass-shaped joint. Clean excess sealant with water before curing. Tools clean easily with water and soap.

  • Tool Within 15 Minutes

    At 50% relative humidity, 75°F:

    • Tack-free30 min
    • Paint ready6-8 hrs
    • Full cure21 days

    Service temperature range: -40°F to 180°F

    Storage

    Follow these guidelines to maintain product effectiveness:

    • Store in original, unopened containers
    • Keep away from heat and direct sunlight
    • Protect from freezing

    Shelf life: 24 months when stored correctly

    When designing and applying joints in construction, it's crucial to follow the ASTM C1193 Standard Guide for use of Joint Sealants and use the recommended backing material and sealant. TOWER Sealants' AU-1 Construction Sealant is easy to apply and clean up, and with proper application and curing, it will provide a durable, waterproof seal that will last the lifetime of the building.
    Modern white commercial building with red and blue accent stripe

    Need Technical Support?

    Need Technical Support?